Meissner makes the LBI Awards shortlist

The Meissner logo on a white panel beside the words Meissner for Digital Innovation & Transformation, on bold blue, orange and red shapes.

Hands up if your weekly capacity plan lives in a spreadsheet and eats most of a morning. 🙋🏻

At Meissner (opens in a new tab)’s Castlebar site, a single weekly upload now replaces two to four hours of manual preparation.

The same platform can estimate the cost of an assembly the site has never made before, in seconds, with a breakdown of labour and materials behind the figure.

It brings labour, material readiness and sterilisation capacity into one view, weeks ahead. And Meissner’s own teams run it, inside their own systems.

Meissner has now been shortlisted for Digital Innovation & Transformation at the Lean Business Ireland (opens in a new tab) Awards 2026 for this work.

Thank you to John O’Shea, MBA, Dip IoD (opens in a new tab), Joseph Convey (opens in a new tab), Tom Kelly (opens in a new tab) and the Meissner team who shaped it with us. To Melissa Proxenos (opens in a new tab), who led the project for Brightbeam. And to Corey Duffy (opens in a new tab) and Darren Moen, who built it.

The full Meissner case study is also now live.

Congratulations to everyone shortlisted. See you on 22 October.

Related

  • Sector

    Medtech

    Planning, material flow, CAPA, complaints and audits in ISO 13485 plants.

  • Case · Medtech · Live

    Any assembly, costed in seconds.

    Meissner. 17 weeks from concept to go-live, to the agreed timeline

More from Brightbeam

So tell us what you’re working on.

Get in touch